0.5.5 — 2026-10-17¶
Hotfix: a schedule's Off now means off for smart circuits and the off-grid action.
Fixed¶
- A schedule set to turn a smart circuit Off no longer turns it On, and "reconnect to the grid" no longer takes the site off-grid. The schedule form saved the choice as the text "false", which the scheduler read as on. On/Off is now read strictly and saved as true/false; a value that is neither is refused, with nothing sent to the gateway. Schedules saved before this release are read correctly without re-saving. If you have a schedule with a smart-circuit or off-grid action, check what it did. (#188)